JAPAN · SMALL AIDC & GPU FACILITIES

Japan data center
development below 2 MW.

Site selection, power coordination and local development support for overseas owners, GPU operators and investors. We work with your preferred region across Japan to turn an initial brief into a decision supported by evidence.

Our focus: below 2 MW of total facility incoming power, including IT equipment, cooling and auxiliary loads. IT load is assessed separately.

Discuss your project

Read the Japan small data center planning guide →

Read the development FAQ: land, power, permits, EPC and operations in Japan →Buying or leasing data center land in Japan →

Data center racks — illustrative image, not a Wallingford project.
Data center racks — illustrative image, not a Wallingford project.

01 / DEVELOPMENT SUPPORT

From an initial brief to a clearer development decision.

Define a focused investigation before committing to land acquisition or detailed design. Scope, deliverables and fees are agreed for each engagement.

01

Site selection & land research

Screen candidate sites against your location and scale requirements. Organise land and facility information, identify gaps and coordinate local enquiries.

Output: candidate comparison and outstanding checks.

02

Utility coordination & power applications

Coordinate through multiple rounds of utility discussions on capacity, connection conditions and construction schedules, working to complete power applications and supply arrangements as efficiently as possible.

Output: enquiry record, responses and unresolved conditions.

03

Design, equipment & construction comparison

Compare specifications, quotations, delivery times and quality at every stage, from design and electrical distribution to cooling, backup power and commissioning. Evaluate operating costs and maintainability alongside initial investment.

Output: response comparison and next-step questions.

02 / DEVELOPMENT APPROACH

How we move your development forward

We adapt to your preferred region and project requirements across Japan. By assessing land, power and construction together, we work to reduce total cost while meeting the reliability your project needs.

SITE SELECTION

Start with your preferred region

We assess development options in your chosen region, including new sites and existing facilities. Land use, site conditions, power, connectivity and disaster exposure inform a comparison tailored to your project.

POWER COORDINATION

Keep power applications moving

We coordinate through multiple rounds of discussions with the utility to advance the required power applications and supply arrangements as efficiently as possible. Capacity, connection conditions and construction schedules are aligned with your development goals.

COST & RELIABILITY

Compare every stage, optimise the whole

From concept design to electrical distribution, cooling, backup power, building works and commissioning, we research and compare specifications, quotations, quality and lead times. Capital and operating costs, redundancy and maintainability inform a solution that meets reliability requirements at the lowest practical total cost.

03 / WORKING TOGETHER

A practical way to begin

  1. 01

    Define

    Confirm project stage, preferred region, customer or workload requirements, total incoming power, IT load and decision criteria.

  2. 02

    Investigate

    Agree scope and fees; gather site and power evidence, compare development options and track conditions that remain open.

  3. 03

    Review

    Compare specifications, reliability, capital and operating costs before deciding whether to commit to the next stage.

Before we begin

What does “below 2 MW” mean?

It means our project focus is below 2 MW of total facility incoming power, including IT equipment, cooling, electrical losses and auxiliary loads. It does not mean 2 MW of GPU or server capacity, and it is not a promise of simplified approvals.

Should we build a facility or use colocation?

Compare both against the same IT load, rack density, cooling, resilience, operating responsibilities and delivery requirements. A small standalone facility is not automatically cheaper. Our colocation versus self-build framework sets out the checks.

Can you guarantee land or power availability?

No. Availability, connection conditions, timing and approvals must be confirmed with landowners, utilities and relevant authorities. Discussions and applications do not reserve capacity.

Can we start before a site is selected?

Yes. Start with your project stage, preferred region, total incoming power requirement and target dates. We can discuss an initial screening scope anywhere in Japan that fits your requirements.

Do you provide engineering design or construction?

This page offers research and coordination support. Detailed engineering, formal applications and construction require a separately agreed scope and the relevant qualified providers.

Policy and technical explainers: Japan's GX Strategic Regions for data center clusters · Tokyo's data center guideline · PUE and Japan's Energy Conservation Act

04 / START A CONVERSATION

Tell us what you are planning.

Share an initial brief. The form prepares a draft on this page; you review it and open your email application to send it.

Or email us directly